Before you award a machined part, find out what the lower price leaves open. I compare two supplier offers against one drawing revision and one batch quantity.

Illustrative first lot100 heat-treated sprockets
Quoted scope Offer A Offer B
Price per piece €18.00 €15.75
Hardening 56–60 HRC Unspecified
Export crate Included Excluded
Fixture €160 €280

The €225 difference in piece prices falls to €105 for the first lot once fixtures are included. Treatment, packing and transport are still open.

Illustrative quote review

What changes the price?

Two machine shops quote the same sprocket. Follow the first lot from piece price to the questions still open.

Start with 100 sprockets.

€225

Shop B quotes less for the parts. Both offers cover drawing SP-17, revision C.

Quoted costShop AShop B
Unit price€18.00€15.75
100 pieces€1,800€1,575

Include the first-lot fixtures.

€105

Shop B’s fixture costs €120 more. Its first-lot advantage drops from €225 to €105.

Quoted costShop AShop B
100 pieces€1,800€1,575
Fixture€160€280
First-lot subtotal€1,960€1,855

Ask for written confirmation.

The €105 is provisional. Before award, ask Shop B to price or confirm each item and compare delivery to the same destination.

Heat treatment
Confirm induction hardening to 56–60 HRC and any extra charge.
Inspection
Agree on tooth-flank test locations, method and sample record.
Export crate
Packing is excluded. Request a price per shipment.

Illustrative walkthrough · Silent · 0:35

What happened to the €225 saving?

Follow two offers for 100 sprockets. A fixture charge changes the comparison before either part has left the factory.

Request a proposal for my part
Read the calculation

For 100 pieces, A quotes €1,800 and B €1,575. Add €160 for A’s fixture and €280 for B’s. First-lot subtotals become €1,960 and €1,855. The remaining gap is €105. Ask B to confirm heat treatment, testing and crating in writing. Then compare the full cost to the same destination.

Fees & deliverables

Choose how to use the review.

Free worksheet

An editable Excel file with example figures. Replace them with your supplier prices, one-time charges and delivery assumptions.

Download Excel

Commission a review

I complete the comparison for your part and write a recommendation you can circulate. You approve the fee and delivery date before work starts. Calls, visits and extra revisions are priced separately if needed.

Request the fixed fee

What purchasing can commission

A comparison you can take to engineering.

Agree the question

Send the part family, quantity, destination and award date. A short description is enough for the free fit check. We agree how to exchange drawings and offers before you share them.

Set the fee and scope

For a desk review I quote one fixed fee for two existing offers, one drawing revision and one lot. If the documents leave a material question open, the note identifies it. Supplier follow-up, extra revisions, site visits and testing can be scoped separately before you approve any additional fee.

Receive the decision note

You get a side-by-side worksheet and a written recommendation. Each material gap has a question, the person who can answer it and the evidence needed before award.

For the receiving plant

Compare the cost at one destination.

For a delivery to Italy, the US or Canada, name the receiving site, currency, trade term and delivery point. I identify what each factory has included. Your forwarder supplies the transport quote and your importer or broker confirms the local charges.

Keep one-time fixture costs separate from repeat-order prices. If the drawing is in inches and a supplier responds in millimetres, record the original tolerance and ask engineering to approve the inspection basis.