
F. Weng / Independent sourcing advisory
Your engineer
in China.
I help machinery buyers find the right workshop, compare supplier quotes and follow a part from machining to inspection.
Machine tool on the workshop floorWENG archive
Services
Where do you need a hand?
Supplier search
- Send
- Part specification, batch size and critical process.
- Receive
- A shortlist showing in-house work, subcontractors and evidence to request before sampling.
- Fee
- Agreed per search. Visits and samples are quoted separately.
Request a supplier search ↗Quote review
- Send
- Two supplier offers, one drawing revision and one lot size.
- Receive
- A side-by-side cost sheet and a written recommendation with questions to settle before award.
- Fee
- Fixed fee and delivery date agreed before the review.
Request a quote review ↗Supply chain coordination
- Send
- The process route, suppliers involved and required assembly date.
- Receive
- A handover schedule with the owner, required evidence and next check at every stage.
- Fee
- Agreed by milestone. Travel and third-party tests require prior approval.
Discuss my supply chain ↗Two machine shops quote the same sprocket. Follow the first lot from piece price to the questions still open.
Start with 100 sprockets.
€225Shop B quotes less for the parts. Both offers cover drawing SP-17, revision C.
| Quoted cost | Shop A | Shop B |
|---|
| Unit price | €18.00 | €15.75 |
|---|
| 100 pieces | €1,800 | €1,575 |
|---|
Include the first-lot fixtures.
€105Shop B’s fixture costs €120 more. Its first-lot advantage drops from €225 to €105.
| Quoted cost | Shop A | Shop B |
|---|
| 100 pieces | €1,800 | €1,575 |
|---|
| Fixture | €160 | €280 |
|---|
| First-lot subtotal | €1,960 | €1,855 |
|---|
Ask for written confirmation.
The €105 is provisional. Before award, ask Shop B to price or confirm each item and compare delivery to the same destination.
- Heat treatment
- Confirm induction hardening to 56–60 HRC and any extra charge.
- Inspection
- Agree on tooth-flank test locations, method and sample record.
- Export crate
- Packing is excluded. Request a price per shipment.
Watch the quote reviewSilent film · 0:35 ▷
Open the MP4 ↗The document shelf
See what lands on your desk.
Three worked examples with illustrative data. Open the original files to see the full worksheets and decision note.
Quote comparison
WENG.XLSX / Sample
SP-17 / revision C
| Requirement | Shop A | Shop B |
|---|
| Material | C45 | C45 |
|---|
| Hardening | 56–60 HRC | Unspecified |
|---|
| Export packing | Included | Excluded |
|---|
Worksheets for scope alignment and costs to a common destination.
Download comparison · XLSX ↓Sample assessment
WENG.PDF / Sample
Should the first batch run?
- Drawing limit
- 56–60 HRC
- Sample S-01
- 58 HRC and 53 HRC
- Recommendation
- Hold release. Investigate the low reading before the buyer decides.
Download assessment · PDF ↓Supplier shortlist & handovers
WENG.XLSX / Sample
Process handovers
- Machining
- Drawing revision, batch ID and quantity
- Heat treatment
- Batch-linked process record and sample ID
- Inspection
- Readings against drawing limits and buyer disposition
Download handover workbook · XLSX ↓
Workshop visit / WENG archiveMachine shop → Heat treater
- Evidence
- The shop sends the part revision, batch ID and quantity.
- Release check
- The receiving shop confirms that the lot and revision match before treatment.
Heat treater → Inspection
- Evidence
- The heat treater sends the batch-linked process record and sample ID.
- Release check
- The quality lead checks the sample identity, test method and measurement locations.
Inspection → Buyer engineering
- Evidence
- Inspection sends sample readings against the drawing limits.
- Release check
- The buyer records release, asks for a retest or decides on a deviation.
Discuss my handover plan ↗Field notes
Before the order moves.
Sample approval
The drawing specified 56–60 HRC. The lowest recorded reading was 48. Read how the buyer approached release.
Read the sprocket caseDelivery recovery
An Italian buyer weighed an overtime charge against a proposed 20-day reduction in the factory schedule.
Read the delivery case